PJ180 Operation Tutorials
PJ180 uses the same PLC touchscreen resin-control system as SJ4060. Use these tutorials for resin setup, calibration, cleaning and daily checks. Camera operation and XYZ programming do not apply to PJ180.
Start with the touchscreen controls, then check A/B delivery, mixer air, tank levels and heating before a test dispense.
Touchscreen Function Introduction
Get familiar with the PLC touchscreen controls shared by PJ180 and SJ4060.
Duration: 1:22
A/B Resin Delivery Calibration
Check A and B delivery by weight using the shared PLC calibration controls.
Duration: 9:11
Read Step-by-Step GuideVent Air Bubbles from the Mixing Tube
Follow the shared resin-system controls to remove trapped air before test dispensing.
Duration: 7:27
Read Step-by-Step GuideA/B and Cleaning Tank Low-Level Alarms
Check the low-level alarm controls for the A, B and cleaning tanks.
Duration: 0:42
Tank Heating Function
Use the shared tank-heating controls with the temperature approved for your resin.
Duration: 1:23
Use these videos after production or when a pause requires attention to material remaining in the mixing path.
Flush the Mixing Tube
Use after a production run to review the cleaning sequence for the dispensing path.
Duration: 2:48
Mixing Tube Anti-Curing Function
Use during a production pause to review the anti-curing function for material in the mixing tube.
Duration: 2:04
Use these videos only when your PJ180 includes the relevant tank-stirring or multi-nozzle option.
Optional Tank Stirring Speed Adjustment
For machines fitted with tank agitators, review the stirring-speed controls.
Duration: 0:39
Install the Multi-Nozzle Dispensing Head Module
Watch when the confirmed machine configuration requires the optional multi-nozzle head.
Duration: 3:56
Adjust Multi-Nozzle Suck-Back Effect
Use after fitting the optional multi-nozzle head to review its suck-back adjustment steps.
Duration: 1:29
