DJ771 Operation Tutorials
Use these videos to prepare resin delivery, program standard sheet patterns and make controlled adjustments on confirmed DJ771 configurations.
Use these steps before initial setup, after a resin refill, or when confirming delivery before a test dispense. The videos show an earlier touchscreen layout; use the current written guide for current English labels, button states and screenshots.
First-Time Setup: Vent Air from the Resin System
Watch before first test dispensing or after a resin-system refill to review the air-venting sequence.
Duration: 5:22
Read Step-by-Step GuideGlue Weight Calibration
Use this when checking resin delivery weight before confirming a production job setting.
Duration: 5:00
Read Step-by-Step GuideInstall the Mixing Tube and Adjust Suck-Back
Watch when fitting a mixing tube or checking material cut-off at the dispensing outlet.
Duration: 3:57
Read Step-by-Step GuideModify Delivery Speed Limits and A/B Ratio
Review the controls used to check confirmed delivery limits and A/B ratio before a test run.
Duration: 2:33
Read Step-by-Step GuideA/B Glue Tank Heating Function
Review the tank-heating controls when bringing the resin delivery system to its confirmed operating condition.
Duration: 1:16
Use these videos when creating or testing a standard sticker-sheet pattern after resin delivery is ready.
Polyline Programming and Glue Volume Adjustment
Watch before a test run when creating a polyline path for a simple sticker sheet.
Duration: 9:10
Read Step-by-Step GuideMulti-Select, Skip-Select, Select All and Test Run
Use when preparing a repeated layout and choosing which points to include in a test run.
Duration: 1:40
Read Step-by-Step GuideIsolated Point Programming and Glue Volume Adjustment
Watch when setting individual dispensing points on a programmed layout.
Duration: 4:28
Read Step-by-Step GuideSimple Pattern Sticker Sheet Programming
Use this full walkthrough when creating a simple pattern sticker-sheet program from the start.
Duration: 21:20
Read Step-by-Step GuideUse these videos after a layout changes or when an existing dispensing path needs controlled coordinate updates.
Update Program Coordinates
Watch after a fixture or layout position changes and program coordinates need updating.
Duration: 4:26
Read Step-by-Step GuideBatch Copy an Existing Dispensing Trajectory
Use when copying an existing dispensing trajectory to repeated positions in a program.
Duration: 4:13
Read Step-by-Step GuideModify Stop Position Coordinates
Watch when a program stop position needs coordinate adjustment after checking the work area.
Duration: 2:24
Use these videos after production or when a pause requires attention to material remaining in the mixing path.
Cleaning Steps after Production
Use after a production run to review the cleaning sequence for the dispensing path.
Duration: 2:42
Read Step-by-Step GuideMixing Tube Anti-Curing Function
Use during a production pause to review the anti-curing function for material in the mixing tube.
Duration: 0:49
Use these videos only when the confirmed DJ771 configuration includes the relevant vacuum or multi-nozzle option.
Glue Tank Vacuuming
For confirmed vacuum-tank configurations, review this before preparing resin for a dispensing run.
Duration: 3:14
Read Step-by-Step GuideInstall the Multi-Nozzle Dispensing Head Module
Watch when the confirmed machine configuration requires the optional multi-nozzle head.
Duration: 3:56
Adjust Multi-Nozzle Suck-Back Effect
Use after fitting the optional multi-nozzle head to review its suck-back adjustment steps.
Duration: 1:29
