SJ4060 Operation Tutorials

Use these videos to set up resin delivery, prepare vision programs and maintain positioning accuracy on SJ4060.

Need Technical Support?

Tell us your machine model and what is happening. Share a photo or short video so our team can help you troubleshoot.
Contact Support
Use these videos to prepare the machine, resin path and operator controls before starting a vision-based job.

Camera Doming Machine Setup Steps

Watch when starting the SJ4060 setup sequence before creating a vision-based dispensing job.
Duration: 2:10

XYZ Movement and Air Venting

Use when checking axis movement and venting air from the resin path during initial setup.
Duration: 6:19

A/B Resin Delivery Calibration

Watch when calibrating the A/B resin component delivery before a production program is confirmed.
Duration: 9:11
Read Step-by-Step Guide

Vent Air Bubbles from the Mixing Tube

Use when trapped air is present in the mixing tube and the resin path needs venting.
Duration: 7:27

Black Suck-Back Valve Function Adjustment

Watch when reviewing the black suck-back valve response at the dispensing outlet.
Duration: 2:50

Touchscreen Function Introduction

Use before setup to orient yourself to the touchscreen controls used in this workflow.
Duration: 1:22
Use these videos when creating a vision template, copying a prepared job or reviewing speed settings for production.

Dispensing Software Template Creation and Simple Sticker Programming

Watch when creating a software template and programming a simple sticker layout.
Duration: 12:25
Read Step-by-Step Guide

Copy a Program File between Two Tables

Watch when transferring a prepared program file from one table to another.
Duration: 2:30

Resin Discharge Speed and Nozzle Moving Speed

Use when reviewing the relationship between resin discharge speed and nozzle movement speed.
Duration: 1:16
Use these videos for routine mixing-tube, anti-curing, heating and low-level alarm tasks around daily production.

Flush the Mixing Tube

Watch after a run or before material remains in the mixing tube for an extended period.
Duration: 2:48

Mixing Tube Anti-Curing Function

Use during a production pause to review the mixing-tube anti-curing function.
Duration: 2:04

Tank Heating Function

Review the tank-heating controls when preparing a resin job that uses this function.
Duration: 1:23

Activate A/B/Cleaning Tank Low-Level Alarm

Use when checking the low-level alarm settings for the A/B and cleaning tanks.
Duration: 0:42
Use these videos when nozzle, camera or reference-plane accuracy needs attention for the current workpiece.

Nozzle Accuracy Calibration

Use after a nozzle or setup change when nozzle-position accuracy needs calibration.
Duration: 3:14
Read Step-by-Step Guide

Camera Accuracy Calibration

Watch when vision positioning needs camera-accuracy calibration.
Duration: 9:32
Read Step-by-Step Guide

Reference Plane Orientation

Use when setting the reference-plane orientation for a vision-coordinate workflow.
Duration: 2:49
Read Step-by-Step Guide

Work-Plane Camera Parameter Calibration

Watch when calibrating work-plane camera parameters for an advanced layout.
Duration: 6:56
Read Step-by-Step Guide
Use these videos for scheduled system flushing or a confirmed optional stirring-motor configuration.

Flush the System with Acetone

Review the shown system-flush sequence for scheduled cleaning; use the approved cleaning material for your configuration.
Duration: 2:08

Optional Stirring Motor Speed Adjustment

For confirmed optional stirring-motor configurations, review the speed adjustment control.
Duration: 0:39

Contact Us

*Your details will be kept strictly confidential with us.